First US-Built LNG Carrier Ordered Since Late 1970s

First US-Built LNG Carrier Ordered Since Late 1970s










The deal includes a firm order and an option for a second ship, with plans to transfer LNG shipbuilding capabilities to the US shipyard gradually.










Go to ship&bunker





Posted

in

by

Tags: