{"id":10038,"date":"2025-05-22T20:02:20","date_gmt":"2025-05-22T20:02:20","guid":{"rendered":"https:\/\/krogragg.com\/?p=10038"},"modified":"2025-05-22T20:02:20","modified_gmt":"2025-05-22T20:02:20","slug":"outstanding-drilling-results-at-sericas-north-sea-cluster-spur-hopes-for-late-june-production-restart","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=10038","title":{"rendered":"\u2018Outstanding\u2019 drilling results at Serica\u2019s North Sea cluster spur hopes for late June production restart"},"content":{"rendered":"<p>    \u2018Outstanding\u2019 drilling results at Serica\u2019s North Sea cluster spur hopes for late June production restart<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>UK-based upstream oil and gas player Serica Energy has provided an update on the activities undertaken to bring its floating production storage and offloading unit (FPSO) back online following a shutdown caused by a storm.<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/outstanding-drilling-results-at-sericas-north-sea-cluster-spur-hopes-for-late-june-production-restart\/\">\u2018Outstanding\u2019 drilling results at Serica\u2019s North Sea cluster spur hopes for late June production restart<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Dragana Nik\u0161e<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/outstanding-drilling-results-at-sericas-north-sea-cluster-spur-hopes-for-late-june-production-restart\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u2018Outstanding\u2019 drilling results at Serica\u2019s North Sea cluster spur hopes for late June production restart UK-based upstream oil and gas player Serica Energy has provided an update on the activities undertaken to bring its floating production storage and offloading unit (FPSO) back online following a shutdown caused by a storm. The post \u2018Outstanding\u2019 drilling results [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3507,4452,3508,224,320,188,4453,3109,1852,4454,4455],"tags":[228],"class_list":["post-10038","post","type-post","status-publish","format-standard","hentry","category-belinda-field","category-bruce","category-cosl-innovator","category-headline","category-north-sea","category-offshore-energy-biz","category-parkmead","category-serica","category-serica-energy","category-triton","category-triton-fpso","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/10038"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10038"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/10038\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10038"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10038"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10038"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}