{"id":10546,"date":"2025-05-30T20:02:45","date_gmt":"2025-05-30T20:02:45","guid":{"rendered":"https:\/\/krogragg.com\/?p=10546"},"modified":"2025-05-30T20:02:45","modified_gmt":"2025-05-30T20:02:45","slug":"vigor-completes-uss-tripoli-cmav-ahead-of-schedule","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=10546","title":{"rendered":"Vigor completes USS Tripoli CMAV ahead of schedule"},"content":{"rendered":"<p>    Vigor completes USS Tripoli CMAV ahead of schedule<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Vigor Marine CM San Diego, a division of Vigor Marine Group, has successfully completed a Continuous Maintenance Availability (CMAV) on USS<em> Tripoli<\/em> (LHA 7), returning the vessel five days ahead of schedule. More than 250 skilled workers supported the effort to get the <em>Tripoli <\/em>back to the fleet ahead of schedule, allowing the vessel to commence its <a href=\"https:\/\/www.surfpac.navy.mil\/Media\/News\/Article\/4067008\/uss-tripoli-to-forward-deploy-to-japan\/\">rotation to Japan.<\/a><\/p>\n<p>\u201cThis successful availability showed our skilled workers\u2019 commitment to excellence and to the success of our customer, the U.S. Navy,\u201d said Adam Beck, head of maintenance and modernization Pacific for Vigor Marine Group. \u201cWe are aware of the importance of quality, on-time maintenance to the success of the warfighter and we are proud of our team for the work they do in support of our national defense.\u201d<\/p>\n<p>The CMAV consisted of a comprehensive body of work, including platform repairs, tank repairs and preservation, bulkhead shaft seal repair, pump mechanical seals, service diesel generator repair, piping replacements, rotating machinery\/pump overhaul and replacement, refrigeration compressor overhaul and various aircraft\/cargo weapon elevator repairs. Work was completed at the CM San Diego shipyard from February through mid-May.<\/p>\n<p>\u201cThe expert team in San Diego not only completed this work ahead of schedule, they did it with a strong focus on working safely,\u201d said Carlos Aguayo, president of Vigor Marine CM San Diego. \u201cOur strong relationship with the Navy is founded on our commitment to their success and our safe, quality performance. We are grateful to be a partner of choice and look forward to further opportunities to support our valued customer.\u201d<\/p>\n<p>This is the second time that Vigor Marine CM San Diego, formerly <a href=\"https:\/\/www.marinelog.com\/?s=Continental+Maritime\">Continental Maritime of San Diego,<\/a>  has been trusted with an availability on the <em>Tripoli.<\/em> The shipyard continues work on the USS <em>Russell <\/em>(DDG 59) DSRA, USS <em>Momsen<\/em> (DDG 92) and the planning for an upcoming SRA on the USS <em>Steret<\/em>t (DDG 104). <\/p>\n<\/p>\n<p>The post <a href=\"https:\/\/www.marinelog.com\/shipbuilding\/shipyards\/shipyard-news\/vigor-completes-uss-tripoli-cmav-ahead-of-schedule\/\">Vigor completes USS Tripoli CMAV ahead of schedule<\/a> appeared first on <a href=\"https:\/\/www.marinelog.com\/\">Marine Log<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Marine Log Staff<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.marinelog.com\/shipbuilding\/shipyards\/shipyard-news\/vigor-completes-uss-tripoli-cmav-ahead-of-schedule\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=vigor-completes-uss-tripoli-cmav-ahead-of-schedule\">Go to marinelog<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vigor completes USS Tripoli CMAV ahead of schedule Vigor Marine CM San Diego, a division of Vigor Marine Group, has successfully completed a Continuous Maintenance Availability (CMAV) on USS Tripoli (LHA 7), returning the vessel five days ahead of schedule. More than 250 skilled workers supported the effort to get the Tripoli back to the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[192,199,617,437,285,4594,4595,4596],"tags":[193],"class_list":["post-10546","post","type-post","status-publish","format-standard","hentry","category-marinelog","category-news","category-ship-repair","category-shipyard","category-shipyard-news","category-uss-tripoli","category-vigor-industrial","category-vigor-marine-cm-san-diego","tag-marinelog"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/10546"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10546"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/10546\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}