{"id":11075,"date":"2025-06-08T19:03:25","date_gmt":"2025-06-08T19:03:25","guid":{"rendered":"https:\/\/krogragg.com\/?p=11075"},"modified":"2025-06-08T19:03:25","modified_gmt":"2025-06-08T19:03:25","slug":"real-life-incident-an-improved-plan-and-an-unsupervised-unsafe-act-end-in-tragedy","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=11075","title":{"rendered":"Real Life Incident: An Improved Plan and An Unsupervised Unsafe Act End in Tragedy"},"content":{"rendered":"<p>    Real Life Incident: An Improved Plan and An Unsupervised Unsafe Act End in Tragedy<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<div><img data-recalc-dims=\"1\" loading=\"lazy\" width=\"300\" height=\"157\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-300x157.jpg?resize=300%2C157&#038;ssl=1\" class=\"attachment-medium size-medium wp-post-image\" alt=\"Tug\" style=\"margin-bottom: 15px;margin-right:10px;width:150px; height:150px;float:left;\" decoding=\"async\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-150x79.jpg 150w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\"><\/div>\n<p class=\"ai-optimize-6 ai-optimize-introduction\">A tug assisted a tanker with a wire rope towline, and then went to anchor nearby in order to heave in the heavy line. This wire rope towline was not connected to the tug\u2019s towing winch aft, and it was decided to haul it in using the gypsy-head of the anchor windlass. The rigging went through the stern fairlead and along the starboard side of the tug to the windlass.<\/p>\n<p class=\"ai-optimize-7\">A polypropylene mooring line was attached to the wire rope towing line as a pulling hawser. A step-by-step transfer manoeuvre was employed to heave in the wire rope towline. Crew were stationed fore and aft to monitor the operation.<\/p>\n<p><img data-recalc-dims=\"1\" fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-1865271\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug.jpg?resize=1200%2C628&#038;ssl=1\" alt=\"Tug\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug.jpg 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/02\/Tug-150x79.jpg 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><\/p>\n<p class=\"ai-optimize-8\">Crew member A was stationed between the two positions so he could assist at either end. At one point when transferring the pulling hawser, when there was no tension on the rope, crew member A put the pulling hawser outboard of the starboard bitt. Another crew member remarked that it was dangerous to have this line outboard of the bitt and he brought it back to the inboard position.<\/p>\n<p class=\"ai-optimize-9\">As the tension was brought on the pulling hawser there was a loud sound and pulling was stopped at the windlass. Crew member A was found pinned against the tug\u2019s superstructure by the pulling hawser. Unknown to the other crew, who did not have a line of sight to the victim, crew member A had repositioned the pulling hawser back outboard of the bitt. When it came under tension, the pulling hawser slipped off the top of the bitt with accumulated energy and trapped crew member A against the superstructure.<\/p>\n<p class=\"ai-optimize-10\">First aid was administered and the victim quickly evacuated ashore. He was later declared deceased due to serious internal injuries.<\/p>\n<p class=\"ai-optimize-11\">The report enumerated an exhaustive list of labour regulations that crew member A had apparently breached.<\/p>\n<h2 class=\"ai-optimize-12\">Lessons learned<\/h2>\n<ul>\n<li class=\"ai-optimize-13\">Although the accident investigation was diligent in documenting the accident facts, the analysis is a litany of \u2018blame the victim\u2019. The victim certainly acted against an agreed procedure by placing the pulling hawser outboard of the bitt, but what about the lack of supervision that allowed this dangerous act?<\/li>\n<li class=\"ai-optimize-14\">The agreed procedure was that no one should be located on the starboard side next to the pulling hawser \u2013 yet crew member A was there, to everyone\u2019s knowledge, until his untimely accident. Again, what of the supervision?<\/li>\n<li class=\"ai-optimize-15\">Why wasn\u2019t the tug\u2019s towing winch used for this operation \u2013 a safe and straightforward method to recover the towline. The report is silent on this matter and on the dangerous improvised method used.<\/li>\n<\/ul>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    MARS Reports<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.marineinsight.com\/case-studies\/real-life-incident-an-improved-plan-and-an-unsupervised-unsafe-act-end-in-tragedy\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=real-life-incident-an-improved-plan-and-an-unsupervised-unsafe-act-end-in-tragedy\">Go to marine insight<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Real Life Incident: An Improved Plan and An Unsupervised Unsafe Act End in Tragedy A tug assisted a tanker with a wire rope towline, and then went to anchor nearby in order to heave in the heavy line. This wire rope towline was not connected to the tug\u2019s towing winch aft, and it was decided [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2955,194],"tags":[197],"class_list":["post-11075","post","type-post","status-publish","format-standard","hentry","category-case-studies","category-marine-insight","tag-marine-insight"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/11075"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11075"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/11075\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11075"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11075"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}