{"id":11924,"date":"2025-06-23T19:03:32","date_gmt":"2025-06-23T19:03:32","guid":{"rendered":"https:\/\/krogragg.com\/?p=11924"},"modified":"2025-06-23T19:03:32","modified_gmt":"2025-06-23T19:03:32","slug":"lng-canada-begins-first-lng-production-prepares-for-initial-shipment-by-end-of-june","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=11924","title":{"rendered":"LNG Canada Begins First LNG Production, Prepares For Initial Shipment By End Of June"},"content":{"rendered":"<p>    LNG Canada Begins First LNG Production, Prepares For Initial Shipment By End Of June<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<div><img data-recalc-dims=\"1\" loading=\"lazy\" width=\"300\" height=\"157\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-300x157.png?resize=300%2C157&#038;ssl=1\" class=\"attachment-medium size-medium wp-post-image\" alt=\"LNG Canada Begins First LNG Production, Prepares for Initial Shipment by End of June\" style=\"margin-bottom: 15px;margin-right:10px;width:150px; height:150px;float:left;\" decoding=\"async\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-300x157.png 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-1024x536.png 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-768x402.png 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-150x79.png 150w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\"><\/div>\n<figure id=\"attachment_1871847\" aria-describedby=\"caption-attachment-1871847\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"wp-image-1871847 size-full\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export.png?resize=1200%2C628\" alt=\"LNG export\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export.png 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-300x157.png 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-1024x536.png 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-768x402.png 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/06\/LNG-export-150x79.png 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-1871847\" class=\"wp-caption-text\">Image Credits: LNG Canada\/Facebook<\/figcaption><\/figure>\n<p>LNG Canada, led by Shell, has officially started producing liquefied natural gas (LNG) at its new export terminal in Kitimat, British Columbia. This is the first time Canada has produced LNG for export, with the first shipment expected to be loaded by mid-year.<\/p>\n<p>According to sources familiar with the start-up, LNG production began at around 4 a.m. local time. For now, gas is being processed through the plant\u2019s first train-known as Train 1, which has a capacity of 5.6 million tonnes per annum (mtpa).<\/p>\n<p>While production has started, the facility is not yet running at full capacity due to a technical issue with one of the processing lines. As a result, only part of the plant is currently operational.<\/p>\n<p>Ship tracking data from LSEG shows that the LNG tanker Gaslog Glasgow is on its way to the Kitimat terminal. The vessel is expected to arrive on June 29 and will be loaded with LNG once it docks, according to sources.<\/p>\n<p>When fully operational, the LNG Canada facility will have an export capacity of 14 mtpa. The terminal is being built as part of a joint venture between several international companies: Shell holds a 40% stake, Malaysia\u2019s Petronas owns 25%, Mitsubishi Corporation and PetroChina each have 15%, and Korea Gas Corporation (Kogas) holds 5%.<\/p>\n<p>The plant is designed to process up to 1.9 billion cubic feet of natural gas per day. The total cost of the project is estimated at $40 billion, making it one of the largest energy investments in the country\u2019s history.<\/p>\n<p>Once LNG Canada reaches full operation, industry analysts expect it to shift a portion of Canada\u2019s natural gas exports away from the United States and toward international markets. Until now, almost all of Canada\u2019s gas exports have gone to its southern neighbor.<\/p>\n<p>Data from the U.S. Energy Information Administration shows that Canadian gas exports to the U.S. increased to about 8.6 billion cubic feet per day in 2024. That\u2019s up from 8 bcf\/d in 2023 and higher than the five-year average of 7.5 bcf\/d.<\/p>\n<p>Additionally, two more LNG export terminals-Woodfibre LNG and Cedar LNG, are currently under construction along Canada\u2019s Pacific Coast. Both projects are expected to be completed between 2027 and 2028.<\/p>\n<p><em>References: offshore technology, oil price<\/em><\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    MI News Network<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.marineinsight.com\/shipping-news\/lng-canada-begins-first-lng-production-prepares-for-initial-shipment-by-end-of-june\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=lng-canada-begins-first-lng-production-prepares-for-initial-shipment-by-end-of-june\">Go to marine insight<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>LNG Canada Begins First LNG Production, Prepares For Initial Shipment By End Of June Image Credits: LNG Canada\/Facebook LNG Canada, led by Shell, has officially started producing liquefied natural gas (LNG) at its new export terminal in Kitimat, British Columbia. This is the first time Canada has produced LNG for export, with the first shipment [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194,196],"tags":[197],"class_list":["post-11924","post","type-post","status-publish","format-standard","hentry","category-marine-insight","category-shipping-news","tag-marine-insight"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/11924"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11924"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/11924\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}