{"id":12093,"date":"2025-06-25T20:02:12","date_gmt":"2025-06-25T20:02:12","guid":{"rendered":"https:\/\/krogragg.com\/?p=12093"},"modified":"2025-06-25T20:02:12","modified_gmt":"2025-06-25T20:02:12","slug":"ferc-easing-rules-to-expedite-construction-of-natural-gas-projects","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=12093","title":{"rendered":"FERC easing rules to expedite construction of natural gas projects"},"content":{"rendered":"<p>    FERC easing rules to expedite construction of natural gas projects<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>The U.S. Federal Energy Regulatory Commission (FERC) has taken action to remove regulatory obstacles and speed up the construction of natural gas infrastructure projects in the United States.\u00a0<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/ferc-easing-rules-to-expedite-construction-of-natural-gas-projects\/\">FERC easing rules to expedite construction of natural gas projects<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Dragana Nik\u0161e<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/ferc-easing-rules-to-expedite-construction-of-natural-gas-projects\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>FERC easing rules to expedite construction of natural gas projects The U.S. Federal Energy Regulatory Commission (FERC) has taken action to remove regulatory obstacles and speed up the construction of natural gas infrastructure projects in the United States.\u00a0 The post FERC easing rules to expedite construction of natural gas projects appeared first on Offshore Energy. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4983,4984,224,188,412],"tags":[228],"class_list":["post-12093","post","type-post","status-publish","format-standard","hentry","category-federal-energy-regulatory-commission-ferc","category-ferc","category-headline","category-offshore-energy-biz","category-usa","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/12093"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12093"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/12093\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}