{"id":12963,"date":"2025-07-10T20:03:02","date_gmt":"2025-07-10T20:03:02","guid":{"rendered":"https:\/\/krogragg.com\/?p=12963"},"modified":"2025-07-10T20:03:02","modified_gmt":"2025-07-10T20:03:02","slug":"delay-induced-clouds-over-uks-oil-gas-decom-realm-warn-of-billions-in-extra-costs-and-fines","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=12963","title":{"rendered":"Delay-induced clouds over UK\u2019s oil &amp; gas decom realm warn of billions in extra costs and fines"},"content":{"rendered":"\n<div>Delay-induced clouds over UK\u2019s oil &#038; gas decom realm warn of billions in extra costs and fines<\/div>\n<p> \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>With the backlog of wells due for decommissioning on the rise, the UK\u2019s regulator, the North Sea Transition Authority (NSTA),\u00a0has issued a stark warning to operators on the UK Continental Shelf (UKCS), urging them to take steps to decommission permanently inactive wells now to stave off a future scenario where they, alongside taxpayers, will need to face cost hikes and potential sanctions because of the missed decommissioning deadlines.<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/delay-induced-clouds-over-uks-oil-gas-decom-realm-warn-of-billions-in-extra-costs-and-fines\/\">Delay-induced clouds over UK\u2019s oil &amp; gas decom realm warn of billions in extra costs and fines<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Melisa Cavcic<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/delay-induced-clouds-over-uks-oil-gas-decom-realm-warn-of-billions-in-extra-costs-and-fines\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Delay-induced clouds over UK\u2019s oil &#038; gas decom realm warn of billions in extra costs and fines With the backlog of wells due for decommissioning on the rise, the UK\u2019s regulator, the North Sea Transition Authority (NSTA),\u00a0has issued a stark warning to operators on the UK Continental Shelf (UKCS), urging them to take steps to [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3157,656,224,356,320,1928,1929,188,659,1137,106],"tags":[228],"class_list":["post-12963","post","type-post","status-publish","format-standard","hentry","category-decom","category-decommissioning","category-headline","category-long-read","category-north-sea","category-north-sea-transition-authority","category-nsta","category-offshore-energy-biz","category-uk","category-uk-north-sea","category-united-kingdom","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/12963"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12963"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/12963\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12963"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12963"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12963"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}