{"id":13792,"date":"2025-07-24T19:02:27","date_gmt":"2025-07-24T19:02:27","guid":{"rendered":"https:\/\/krogragg.com\/?p=13792"},"modified":"2025-07-24T19:02:27","modified_gmt":"2025-07-24T19:02:27","slug":"cma-cgm-totalenergies-to-launch-lng-bunkering-venture-at-port-of-rotterdam","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=13792","title":{"rendered":"CMA CGM &amp; TotalEnergies To Launch LNG Bunkering Venture At Port Of Rotterdam"},"content":{"rendered":"\n<div>CMA CGM &#038; TotalEnergies To Launch LNG Bunkering Venture At Port Of Rotterdam<\/div>\n<p> \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<div><img data-recalc-dims=\"1\" loading=\"lazy\" width=\"300\" height=\"157\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-300x157.png?resize=300%2C157&#038;ssl=1\" class=\"attachment-medium size-medium wp-post-image\" alt=\"CMA CGM &amp; TotalEnergies To Launch LNG Bunkering Venture At Port Of Rotterdam\" style=\"margin-bottom: 15px;margin-right:10px;width:150px; height:150px;float:left;\" decoding=\"async\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-300x157.png 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-1024x536.png 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-768x402.png 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-150x79.png 150w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\"><\/div>\n<figure id=\"attachment_1872991\" aria-describedby=\"caption-attachment-1872991\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img data-recalc-dims=\"1\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-1872991\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam.png?resize=1200%2C628\" alt=\"port of Rotterdam\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam.png 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-300x157.png 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-1024x536.png 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-768x402.png 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/07\/port-of-Rotterdam-150x79.png 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-1872991\" class=\"wp-caption-text\">Image for representation purposes only<\/figcaption><\/figure>\n<p>TotalEnergies, a global integrated energy company, and CMA CGM Group, a global player in sea, land, air and logistics solutions, have entered into an agreement to develop a 50\/50 logistics joint venture dedicated to the implementation and operation of a liquefied natural gas (LNG) bunker supply solution at the port of Rotterdam, in the Netherlands.<\/p>\n<p>This strategic partnership reflects the shared ambition of both French companies to work jointly towards the acceleration of the energy transition in the maritime sector.<\/p>\n<p><strong>Expanding LNG Infrastructure in Europe<\/strong><\/p>\n<p>As part of this new logistics joint venture, a new 20,000 cubic-meter LNG bunker vessel will be positioned in Rotterdam by the end of 2028 and jointly operated.<\/p>\n<p>The CMA CGM-TotalEnergies JV will offer a complete logistics service, from reload access at Gate terminal facilities to LNG bunker delivery to a wide range of vessels operating in the Amsterdam-Rotterdam-Antwerp (ARA) region, including those of CMA CGM as well as other shipping operators.<\/p>\n<p>The joint venture will capitalize on TotalEnergies\u2019 established logistics infrastructure in the ARA region, where the 18,600 m\u00b3 LNG bunker vessel Gas Agility has been in operation since 2020.<\/p>\n<p>By integrating the JV\u2019s future LNG bunker vessel with Gas Agility, the partnership aims to create synergies that enhance delivery flexibility and boost operational efficiency across the region.<\/p>\n<p><strong>A Long-Term LNG Supply Agreement<\/strong><\/p>\n<p>To support CMA CGM\u2019s goal of reaching Net Zero Carbon by 2050 and ensure the supply of its dual-fuel LNG-powered fleet, which will grow to 123 vessels by 2029, TotalEnergies will supply CMA CGM with up to 360,000 tons of LNG annually, from 2028 onwards and until 2040.<\/p>\n<p>\u201cWe are proud to further contribute, alongside a partner like CMA CGM, to the development of an LNG bunkering supply chain in one of Europe\u2019s leading port hubs. LNG is today the most mature and immediately available solution to reduce the environmental footprint of maritime transport. This strategic partnership not only strengthens our position as a major player in LNG bunkering but also illustrates the shared commitment of two leading French companies to actively support the energy transition,\u201d said Patrick Pouyann\u00e9, Chairman and CEO of TotalEnergies.<\/p>\n<p>\u201cWith this joint venture, CMA CGM and TotalEnergies are taking a new step to support the energy transition in shipping. For the first time, a shipping company and an energy provider will jointly operate an LNG bunkering vessel, based in the port of Rotterdam. It is a concrete way to scale up alternative fuels and accelerate the decarbonization of global trade,\u201d said Rodolphe Saad\u00e9, Chairman and CEO of CMA CGM Group.<\/p>\n<p>The creation of the joint venture is subject to applicable regulatory approvals<\/p>\n<p><strong>A Committed Partnership Between Two French Industry Leaders<\/strong><\/p>\n<p>TotalEnergies and CMA CGM have been long-standing partners committed to advancing low-carbon marine solutions:<\/p>\n<ul>\n<li>In 2017: Signing of a 10-year agreement under which TotalEnergies supplies 300,000 tons of LNG annually to CMA CGM in Rotterdam.<\/li>\n<li>In 2019: Signing of a 10-year agreement under which TotalEnergies supplies 250,000 tons of LNG annually to CMA CGM in Marseille Fos.<\/li>\n<li>In 2020: First LNG bunkering of a large CMA CGM container vessel in Rotterdam, with 17,300 m\u00b3 of LNG delivered by TotalEnergies.<\/li>\n<li>In 2021: First LNG bunkering of a CMA CGM container ship in France, in Dunkirk, with nearly 16,400 m\u00b3 of LNG supplied.<\/li>\n<li>In 2022: First ship-to-containership LNG bunkering operation at the Port of Marseille Fos, with around 6,000 m\u00b3 of LNG delivered in Marseille Fos.<\/li>\n<\/ul>\n<p><em>Press Release<\/em><\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    MI News Network<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.marineinsight.com\/shipping-news\/cma-cgm-totalenergies-to-launch-lng-bunkering-venture-at-port-of-rotterdam\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=cma-cgm-totalenergies-to-launch-lng-bunkering-venture-at-port-of-rotterdam\">Go to marine insight<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>CMA CGM &#038; TotalEnergies To Launch LNG Bunkering Venture At Port Of Rotterdam Image for representation purposes only TotalEnergies, a global integrated energy company, and CMA CGM Group, a global player in sea, land, air and logistics solutions, have entered into an agreement to develop a 50\/50 logistics joint venture dedicated to the implementation and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194,196],"tags":[197],"class_list":["post-13792","post","type-post","status-publish","format-standard","hentry","category-marine-insight","category-shipping-news","tag-marine-insight"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/13792"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13792"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/13792\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13792"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13792"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}