{"id":13876,"date":"2025-07-25T20:02:18","date_gmt":"2025-07-25T20:02:18","guid":{"rendered":"https:\/\/krogragg.com\/?p=13876"},"modified":"2025-07-25T20:02:18","modified_gmt":"2025-07-25T20:02:18","slug":"billion-dollar-rig-jobs-raise-valaris-backlog-to-4-7b","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=13876","title":{"rendered":"Billion-dollar rig jobs raise Valaris\u2019 backlog to $4.7B"},"content":{"rendered":"<p>    Billion-dollar rig jobs raise Valaris\u2019 backlog to $4.7B<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Valaris\u00a0has\u00a0won a new batch of rig assignments and extensions, enabling three drillships and three jack-ups to secure work in different geographies. <\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/billion-dollar-rig-jobs-raise-valaris-backlog-to-4-7b\/\">Billion-dollar rig jobs raise Valaris\u2019 backlog to $4.7B<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Melisa Cavcic<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/billion-dollar-rig-jobs-raise-valaris-backlog-to-4-7b\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Billion-dollar rig jobs raise Valaris\u2019 backlog to $4.7B Valaris\u00a0has\u00a0won a new batch of rig assignments and extensions, enabling three drillships and three jack-ups to secure work in different geographies. The post Billion-dollar rig jobs raise Valaris\u2019 backlog to $4.7B appeared first on Offshore Energy. Melisa Cavcic Go to offshore energy biz<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5448,5449,5450,827,2738,2182,4480,224,724,320,5451,537,188,728,1137,2256,5452,5453,5454,2745,5455,4151,5456,5457,5458],"tags":[228],"class_list":["post-13876","post","type-post","status-publish","format-standard","hentry","category-anadarko","category-anasuria-hibiscus-uk","category-east-irish-sea","category-eni","category-fleet-status-report","category-gulf-of-america","category-harbour-energy","category-headline","category-ithaca-energy","category-north-sea","category-occidentail","category-offshore-drilling","category-offshore-energy-biz","category-shell","category-uk-north-sea","category-valaris","category-valaris-110","category-valaris-120","category-valaris-122","category-valaris-247","category-valaris-248","category-valaris-ds-15","category-valaris-ds-16","category-valaris-ds-18","category-valaris-norway","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/13876"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13876"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/13876\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13876"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13876"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}