{"id":1518,"date":"2024-12-04T19:02:19","date_gmt":"2024-12-04T19:02:19","guid":{"rendered":"https:\/\/krogragg.com\/?p=1518"},"modified":"2024-12-04T19:02:19","modified_gmt":"2024-12-04T19:02:19","slug":"nyk-obtains-aip-for-design-concept-of-long-distance-subsea-cable-laying-vessel","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=1518","title":{"rendered":"NYK Obtains AiP For Design Concept Of Long-Distance Subsea Cable-Laying Vessel"},"content":{"rendered":"<p>    NYK Obtains AiP For Design Concept Of Long-Distance Subsea Cable-Laying Vessel<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<div><img data-recalc-dims=\"1\" loading=\"lazy\" width=\"300\" height=\"157\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-300x157.jpg?resize=300%2C157&#038;ssl=1\" class=\"attachment-medium size-medium wp-post-image\" alt=\"NYK Obtains AiP For Design Concept Of Long-Distance Subsea Cable-Laying Vessel\" style=\"margin-bottom: 15px;margin-right:10px;width:150px; height:150px;float:left;\" decoding=\"async\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-150x79.jpg 150w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\"><\/div>\n<figure id=\"attachment_1860354\" aria-describedby=\"caption-attachment-1860354\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img data-recalc-dims=\"1\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-1860354\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel.jpg?resize=1200%2C628&#038;ssl=1\" alt=\"Cable-Laying Vessel\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel.jpg 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2024\/12\/Cable-Laying-Vessel-150x79.jpg 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-1860354\" class=\"wp-caption-text\">Image Credits: NYK Line<\/figcaption><\/figure>\n<p>NYK has recently obtained Approval in Principle (AiP) from ClassNK for the design concept of a cable-laying vessel (\u201cthe vessel\u201d) for the construction of a long-distance subsea direct current (\u201cDC\u201d) transmission network in Japan.<\/p>\n<p>Since suitable locations for wind-power generation, such as Hokkaido, are far from areas of major electricity demand, developing a power transmission network is crucial to increase the amount of electricity generated in the future.<\/p>\n<p>One promising solution to this issue is the construction of a long-distance subsea DC transmission network using cable-laying vessels.<\/p>\n<p>As part of a four-company consortium with Sumitomo Electric Industries, Ltd. (\u2018Sumitomo Electric\u2019), Furukawa Electric Co., Ltd. (\u2018Furukawa Electric\u2019), and Mitsui O.S.K. Lines, Ltd., NYK has been participating in the \u201cDevelopment of construction methods for the installation of cable protecting system, etc. and the development of new cable-laying vessels, etc.\u201d of \u201cResearch and Development of a Multi-purpose and Multi-terminal HIGH Voltage Direct Current Transmission System (RIGHT Project)\u201d, projects subsidized by Japan\u2019s New Energy and Industrial Technology Development Organization (NEDO).<\/p>\n<p>Cooperating with Sumitomo Electric, NYK is developing the basic technology for cable-laying vessels that will contribute to the development of a domestic DC subsea transmission network and we have now obtained the AiP from ClassNK with the cooperation of Furukawa Electric.<\/p>\n<p>We will continue contributing to realizing a decarbonized society by optimizing the vessel\u2019s design.<\/p>\n<p><em>Press Release<\/em><\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    MI News Network<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.marineinsight.com\/shipping-news\/nyk-obtains-aip-for-design-concept-of-long-distance-subsea-cable-laying-vessel\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=nyk-obtains-aip-for-design-concept-of-long-distance-subsea-cable-laying-vessel\">Go to marine insight<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NYK Obtains AiP For Design Concept Of Long-Distance Subsea Cable-Laying Vessel Image Credits: NYK Line NYK has recently obtained Approval in Principle (AiP) from ClassNK for the design concept of a cable-laying vessel (\u201cthe vessel\u201d) for the construction of a long-distance subsea direct current (\u201cDC\u201d) transmission network in Japan. Since suitable locations for wind-power generation, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194,196],"tags":[197],"class_list":["post-1518","post","type-post","status-publish","format-standard","hentry","category-marine-insight","category-shipping-news","tag-marine-insight"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/1518"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1518"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/1518\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}