{"id":17129,"date":"2025-09-19T20:03:11","date_gmt":"2025-09-19T20:03:11","guid":{"rendered":"https:\/\/krogragg.com\/?p=17129"},"modified":"2025-09-19T20:03:11","modified_gmt":"2025-09-19T20:03:11","slug":"jacket-load-out-ticked-off-murphy-preps-for-installation-ops-at-its-asian-oil-project","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=17129","title":{"rendered":"Jacket load-out ticked off: Murphy preps for installation ops at its Asian oil project"},"content":{"rendered":"<p>    Jacket load-out ticked off: Murphy preps for installation ops at its Asian oil project<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Murphy Oil has made progress in the development of its oil project\u00a0in the Cuu Long Basin off the coast of Vietnam, as the construction of a jacket for a central processing platform (CPP) destined to be installed at the site has been completed by PTSC Mechanical &amp; Construction (PTSC M&amp;C), a Vietnam-headquartered turn-key engineering, procurement, construction, installation, transportation, hook-up, and commissioning (EPC\/EPCIC) services contractor.<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/jacket-load-out-ticked-off-murphy-preps-for-installation-ops-at-its-asian-oil-project\/\">Jacket load-out ticked off: Murphy preps for installation ops at its Asian oil project<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Melisa Cavcic<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/jacket-load-out-ticked-off-murphy-preps-for-installation-ops-at-its-asian-oil-project\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jacket load-out ticked off: Murphy preps for installation ops at its Asian oil project Murphy Oil has made progress in the development of its oil project\u00a0in the Cuu Long Basin off the coast of Vietnam, as the construction of a jacket for a central processing platform (CPP) destined to be installed at the site has [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[224,6317,6318,6319,5721,188,6320,6321,50],"tags":[228],"class_list":["post-17129","post","type-post","status-publish","format-standard","hentry","category-headline","category-lac-da-vang","category-lac-da-vang-a","category-murphy","category-murphy-oil","category-offshore-energy-biz","category-ptsc-mc","category-ptsc-mechanical-construction","category-vietnam","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/17129"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17129"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/17129\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}