{"id":19158,"date":"2025-10-25T19:02:21","date_gmt":"2025-10-25T19:02:21","guid":{"rendered":"https:\/\/krogragg.com\/?p=19158"},"modified":"2025-10-25T19:02:21","modified_gmt":"2025-10-25T19:02:21","slug":"first-offshore-export-cable-installed-at-inch-cape-wind-farm-off-scotland","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=19158","title":{"rendered":"First Offshore Export Cable Installed At Inch Cape Wind Farm Off Scotland"},"content":{"rendered":"<p>    First Offshore Export Cable Installed At Inch Cape Wind Farm Off Scotland<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<div><img data-recalc-dims=\"1\" loading=\"lazy\" width=\"300\" height=\"157\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-300x157.jpg?resize=300%2C157&#038;ssl=1\" class=\"attachment-medium size-medium wp-post-image\" alt=\"First Offshore Export Cable Installed At Inch Cape Wind Farm Off Scotland\" style=\"margin-bottom: 15px;margin-right:10px;width:150px; height:150px;float:left;\" decoding=\"async\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-150x79.jpg 150w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\"><\/div>\n<figure id=\"attachment_1877404\" aria-describedby=\"caption-attachment-1877404\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1877404\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm.jpg?resize=1200%2C628\" alt=\"Offshore Wind Farm\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm.jpg 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/Offshore-Wind-Farm-150x79.jpg 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-1877404\" class=\"wp-caption-text\">Image Credits: Inch Cape\/LinkedIn<\/figcaption><\/figure>\n<p>The first offshore export cable has been successfully installed at the Inch Cape Offshore Wind Farm, marking a major milestone in the project\u2019s construction phase off the east coast of Scotland.<\/p>\n<p>The 220-kilovolt (kV), three-phase export cable, stretching 85 kilometres, was installed in three 28-kilometre sections by Enshore Subsea using the CMOS Installer cable-laying vessel operating from the Port of Blyth.<\/p>\n<p>Once operational, the cable will carry electricity from the 1.1-gigawatt (GW) offshore wind farm to the project\u2019s new onshore substation currently under construction at Cockenzie, East Lothian.<\/p>\n<figure id=\"attachment_1877405\" aria-describedby=\"caption-attachment-1877405\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1877405\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cable-lay-vessel.jpg?resize=1200%2C628\" alt=\"cable lay vessel\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cable-lay-vessel.jpg 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cable-lay-vessel-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cable-lay-vessel-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cable-lay-vessel-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cable-lay-vessel-150x79.jpg 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-1877405\" class=\"wp-caption-text\">Image Credits: Inch Cape\/LinkedIn<\/figcaption><\/figure>\n<p>The installation required two offshore joints, which were completed with the assistance of the vessel North Sea Giant. The cable will soon be buried beneath the seabed to ensure protection and stability.<\/p>\n<p>The 2000mm\u00b2 cable, manufactured by Ningbo Orient Wires &amp; Cables Co. Ltd (Orient Cable), is among the largest alternating current (AC) export cables in the world.<\/p>\n<p>A second 85-kilometre export cable will also be installed by Enshore Subsea in 2026, again laid in three 28-kilometre sections during a separate campaign.<\/p>\n<figure id=\"attachment_1877406\" aria-describedby=\"caption-attachment-1877406\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1877406\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cables.jpg?resize=1200%2C628\" alt=\"cables\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cables.jpg 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cables-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cables-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cables-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/cables-150x79.jpg 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-1877406\" class=\"wp-caption-text\">Image Credits: Enshore Subsea\/LinkedIn<\/figcaption><\/figure>\n<p>According to project officials, the completion of the first export cable represents a crucial connection between the offshore and onshore substations. The achievement reflects the strong collaboration between the Inch Cape project team and its supply chain partners, including Orient Cable and Enshore Subsea.<\/p>\n<p>The CEO of Enshore Subsea, Pierre Boyde, said that the installation marks an important step in the project\u2019s progress and emphasised their ongoing commitment to supporting the safe and efficient completion of the remaining offshore works.<\/p>\n<p>Inch Cape\u2019s offshore construction phase is now well underway, with both the offshore substation platform and the first export cable installed. The first of the project\u2019s XXL monopiles has also arrived at the Port of Leith.<\/p>\n<figure id=\"attachment_1877407\" aria-describedby=\"caption-attachment-1877407\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1877407\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/offshore-export-cables.jpg?resize=1200%2C628\" alt=\"offshore export cables\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/offshore-export-cables.jpg 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/offshore-export-cables-300x157.jpg 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/offshore-export-cables-1024x536.jpg 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/offshore-export-cables-768x402.jpg 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/10\/offshore-export-cables-150x79.jpg 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-1877407\" class=\"wp-caption-text\">Image Credits: Enshore Subsea\/LinkedIn<\/figcaption><\/figure>\n<p>In 2026, the developers plan to install monopile and jacket foundations along with the first of 72 Vestas 15-megawatt (MW) turbines. The onshore substation at Cockenzie is also expected to be completed next year.<\/p>\n<p>The project remains on schedule to deliver first power by late 2026 and to begin full commercial operations in 2027.<\/p>\n<p>Inch Cape, owned equally by ESB and Red Rock Renewables, is expected to produce around 5 terawatt hours (TWh) of electricity each year, enough to power about half of Scotland\u2019s homes.<\/p>\n<p><em>Reference: inchcapewind<\/em><\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    MI News Network<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.marineinsight.com\/shipping-news\/first-offshore-export-cable-installed-at-inch-cape-wind-farm-off-scotland\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=first-offshore-export-cable-installed-at-inch-cape-wind-farm-off-scotland\">Go to marine insight<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>First Offshore Export Cable Installed At Inch Cape Wind Farm Off Scotland Image Credits: Inch Cape\/LinkedIn The first offshore export cable has been successfully installed at the Inch Cape Offshore Wind Farm, marking a major milestone in the project\u2019s construction phase off the east coast of Scotland. The 220-kilovolt (kV), three-phase export cable, stretching 85 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194,196],"tags":[197],"class_list":["post-19158","post","type-post","status-publish","format-standard","hentry","category-marine-insight","category-shipping-news","tag-marine-insight"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/19158"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19158"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/19158\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}