{"id":19277,"date":"2025-10-28T20:03:46","date_gmt":"2025-10-28T20:03:46","guid":{"rendered":"https:\/\/krogragg.com\/?p=19277"},"modified":"2025-10-28T20:03:46","modified_gmt":"2025-10-28T20:03:46","slug":"tennet-completes-700-mw-grid-connection-program-as-dutch-offshore-grid-receives-readiness-certificate","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=19277","title":{"rendered":"TenneT completes 700 MW grid connection program as Dutch offshore grid receives readiness certificate"},"content":{"rendered":"<p>    TenneT completes 700 MW grid connection program as Dutch offshore grid receives readiness certificate<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Dutch transmission system operator (TSO) TenneT has completed its 700 MW offshore grid connection [\u2026]<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/tennet-completes-700-mw-grid-connection-program-as-dutch-offshore-grid-receives-readiness-certificate\/\">TenneT completes 700 MW grid connection program as Dutch offshore grid receives readiness certificate<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Adrijana Buljan<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/tennet-completes-700-mw-grid-connection-program-as-dutch-offshore-grid-receives-readiness-certificate\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TenneT completes 700 MW grid connection program as Dutch offshore grid receives readiness certificate Dutch transmission system operator (TSO) TenneT has completed its 700 MW offshore grid connection [\u2026] The post TenneT completes 700 MW grid connection program as Dutch offshore grid receives readiness certificate appeared first on Offshore Energy. Adrijana Buljan Go to offshore [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6813,224,5894,188,6814,1047],"tags":[228],"class_list":["post-19277","post","type-post","status-publish","format-standard","hentry","category-grid-connection","category-headline","category-hollandse-kust-west-beta","category-offshore-energy-biz","category-oranjewind","category-tennet","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/19277"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19277"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/19277\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19277"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19277"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}