{"id":20987,"date":"2025-11-28T20:02:26","date_gmt":"2025-11-28T20:02:26","guid":{"rendered":"https:\/\/krogragg.com\/?p=20987"},"modified":"2025-11-28T20:02:26","modified_gmt":"2025-11-28T20:02:26","slug":"scotlands-clean-energy-zest-grows-as-it-signs-off-on-new-subsea-cable-link-and-banniskirk-hub","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=20987","title":{"rendered":"Scotland\u2019s clean energy zest grows as it signs off on new subsea cable link and Banniskirk Hub"},"content":{"rendered":"<p>    Scotland\u2019s clean energy zest grows as it signs off on new subsea cable link and Banniskirk Hub<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Scottish transmission system operator (TSO) SSEN Transmission has collected all permissions needed for a high voltage direct current (HVDC) subsea cable link between Sinclair\u2019s Bay in Caithness and Rattray Head near Peterhead, thanks to a marine license for the subsea electricity transmission project and a planning consent for a clean energy project that will see the construction of a new 400 kV substation and HVDC converter station in the Spittal area.<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/scotlands-clean-energy-zest-grows-as-it-signs-off-on-new-subsea-cable-link-and-banniskirk-hub\/\">Scotland\u2019s clean energy zest grows as it signs off on new subsea cable link and Banniskirk Hub<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Melisa Cavcic<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/scotlands-clean-energy-zest-grows-as-it-signs-off-on-new-subsea-cable-link-and-banniskirk-hub\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Scotland\u2019s clean energy zest grows as it signs off on new subsea cable link and Banniskirk Hub Scottish transmission system operator (TSO) SSEN Transmission has collected all permissions needed for a high voltage direct current (HVDC) subsea cable link between Sinclair\u2019s Bay in Caithness and Rattray Head near Peterhead, thanks to a marine license for [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7158,224,188,7157,7159,274],"tags":[228],"class_list":["post-20987","post","type-post","status-publish","format-standard","hentry","category-banniskirk-hub","category-headline","category-offshore-energy-biz","category-scotland","category-spittal-peterhead-subsea-cable-link","category-ssen-transmission","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/20987"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20987"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/20987\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}