{"id":21917,"date":"2025-12-16T19:02:47","date_gmt":"2025-12-16T19:02:47","guid":{"rendered":"https:\/\/krogragg.com\/?p=21917"},"modified":"2025-12-16T19:02:47","modified_gmt":"2025-12-16T19:02:47","slug":"meyer-werft-secures-11-7-billion-shipbuilding-order-from-msc-cruises","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=21917","title":{"rendered":"Meyer Werft Secures $11.7 Billion Shipbuilding Order From MSC Cruises"},"content":{"rendered":"<p>    Meyer Werft Secures $11.7 Billion Shipbuilding Order From MSC Cruises<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<div><img data-recalc-dims=\"1\" loading=\"lazy\" width=\"300\" height=\"157\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-300x157.png?resize=300%2C157&#038;ssl=1\" class=\"attachment-medium size-medium wp-post-image\" alt=\"Meyer Werft Secures $11.7 Billion Shipbuilding Order From MSC Cruises\" style=\"margin-bottom: 15px;margin-right:10px;width:150px; height:150px;float:left;\" decoding=\"async\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-300x157.png 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-1024x536.png 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-768x402.png 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-150x79.png 150w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft.png 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\"><\/div>\n<figure id=\"attachment_1880827\" aria-describedby=\"caption-attachment-1880827\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img data-recalc-dims=\"1\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-1880827\" src=\"https:\/\/i0.wp.com\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft.png?resize=1200%2C628\" alt=\"Meyer Werft\" width=\"1200\" height=\"628\" srcset=\"https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft.png 1200w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-300x157.png 300w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-1024x536.png 1024w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-768x402.png 768w, https:\/\/www.marineinsight.com\/wp-content\/uploads\/2025\/12\/Meyer-Werft-150x79.png 150w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-1880827\" class=\"wp-caption-text\">Image Credits: Meyer Werft\/Fb<\/figcaption><\/figure>\n<p>German shipbuilder Meyer Werft has secured a shipbuilding order worth \u20ac10 billion ($11.7 billion) from MSC Cruises, a deal that will keep the Papenburg-based yard fully occupied for more than a decade.<\/p>\n<p>Germany\u2019s Economy Minister Katherina Reiche confirmed that the agreement covers shipbuilding projects running through 2033, with two additional optional projects extending to 2035. She added that MSC Cruises has emerged as a strong long-term partner for the shipyard.<\/p>\n<p>According to a separate statement from the Economy Ministry, the agreement is expected to involve the construction of between four and six cruise ships.<\/p>\n<p>The work will fully utilise Meyer Werft\u2019s production capacity at its Papenburg yard in northern Germany, close to the Dutch border, until 2035.<\/p>\n<p>The order follows the state rescue of Meyer Werft last year, after the company came close to bankruptcy. The German federal government and the state of Lower Saxony each acquired a 40% stake in the shipbuilder, investing a combined \u20ac400 million, and provided \u20ac2.6 billion in credit support to stabilise the business.<\/p>\n<p>The shipyard was badly affected by the Covid-19 pandemic and the economic impact of the war in Ukraine, which severely disrupted cruise ship orders and financing.<\/p>\n<p>The Economy Ministry said the restructuring process began in early 2024 and is scheduled to be completed by the end of 2028.<\/p>\n<p>Reiche said the government plans to continue supporting Meyer Werft until it is financially stable and able to operate on its own. She added that authorities are working towards re-privatising the shipyard once it is considered strong enough to return to the market.<\/p>\n<p>The MSC Cruises order is expected to provide long-term security for Meyer Werft\u2019s workforce and strengthen Germany\u2019s position in the global cruise shipbuilding sector.<\/p>\n<p><em>Reference: Bloomberg<\/em><\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    MI News Network<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.marineinsight.com\/shipping-news\/meyer-werft-secures-11-7-billion-shipbuilding-order-from-msc-cruises\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=meyer-werft-secures-11-7-billion-shipbuilding-order-from-msc-cruises\">Go to marine insight<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Meyer Werft Secures $11.7 Billion Shipbuilding Order From MSC Cruises Image Credits: Meyer Werft\/Fb German shipbuilder Meyer Werft has secured a shipbuilding order worth \u20ac10 billion ($11.7 billion) from MSC Cruises, a deal that will keep the Papenburg-based yard fully occupied for more than a decade. Germany\u2019s Economy Minister Katherina Reiche confirmed that the agreement [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194,196],"tags":[197],"class_list":["post-21917","post","type-post","status-publish","format-standard","hentry","category-marine-insight","category-shipping-news","tag-marine-insight"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/21917"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21917"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/21917\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}