{"id":22712,"date":"2026-01-02T20:02:26","date_gmt":"2026-01-02T20:02:26","guid":{"rendered":"https:\/\/krogragg.com\/?p=22712"},"modified":"2026-01-02T20:02:26","modified_gmt":"2026-01-02T20:02:26","slug":"bae-norfolk-gets-10-4m-mod-to-laboon-dsra-contract","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=22712","title":{"rendered":"BAE Norfolk gets $10.4M mod to Laboon DSRA contract"},"content":{"rendered":"<p>    BAE Norfolk gets $10.4M mod to Laboon DSRA contract<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>BAE Systems Maritime Solutions Norfolk, Norfolk, Va. (NMS), has been awarded a $10,398,203 firm-fixed-price modification for additional mission critical work to <a href=\"https:\/\/www.marinelog.com\/shipbuilding\/shipyards\/shipyard-news\/bae-norfolk-wins-new-navy-contracts-worth-202m\/\">previously awarded contract <\/a>(N00024-25-C-4412) for the USS <em>Laboon <\/em>(DDG 58) fiscal year 2025 dry-dock selected restricted availability.(<a href=\"https:\/\/www.navycommissionings.org\/ShipbuildingMilestones.php\">DSRA<\/a>)<\/p>\n<p>Work will be performed in Norfolk and is expected to be completed by July 2026. Fiscal 2025 other procurement (Navy) funds in the amount of $10,398,203 will be obligated at time of award and will not expire at the end of the current fiscal year.<\/p>\n<p>Mid-Atlantic Regional Maintenance Center, Norfolk, is the contracting activity<\/p>\n<p>BAE Systems Maritime Solutions Norfolk\u2019s (NMS) primary customer is the U.S. Navy. Located on the Elizabeth River with excellent access to Hampton Roads, the Chesapeake Bay and the Atlantic Ocean,.the NMS shipyard is deally positioned to serve the requirements and needs of the Navy. extensive safety awareness programs, environmental protection best practices, and a clean, orderly facility. The full-service repair facility is ISO 9001 1994 certified.<\/p>\n<p>Facilities include:<\/p>\n<ul class=\"wp-block-list\">\n<li>Four piers \u2013 3015 ft<\/li>\n<li>Titan dry dock \u2013 52,500 ton lift<\/li>\n<li>Old Dominion dry dock \u2013 14,000 ton lift<\/li>\n<\/ul>\n<p>The post <a href=\"https:\/\/www.marinelog.com\/news\/bae-norfolk-gets-10-4m-mod-to-laboon-dsra-contract\/\">BAE Norfolk gets $10.4M mod to Laboon DSRA contract<\/a> appeared first on <a href=\"https:\/\/www.marinelog.com\/\">Marine Log<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Marine Log Staff<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.marinelog.com\/news\/bae-norfolk-gets-10-4m-mod-to-laboon-dsra-contract\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=bae-norfolk-gets-10-4m-mod-to-laboon-dsra-contract\">Go to marinelog<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BAE Norfolk gets $10.4M mod to Laboon DSRA contract BAE Systems Maritime Solutions Norfolk, Norfolk, Va. (NMS), has been awarded a $10,398,203 firm-fixed-price modification for additional mission critical work to previously awarded contract (N00024-25-C-4412) for the USS Laboon (DDG 58) fiscal year 2025 dry-dock selected restricted availability.(DSRA) Work will be performed in Norfolk and is [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7534,1740,192,199,285,7535],"tags":[193],"class_list":["post-22712","post","type-post","status-publish","format-standard","hentry","category-bae-systems-maritime-solutions","category-dsra","category-marinelog","category-news","category-shipyard-news","category-uss-laboon","tag-marinelog"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/22712"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22712"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/22712\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}