{"id":25237,"date":"2026-02-20T20:02:19","date_gmt":"2026-02-20T20:02:19","guid":{"rendered":"https:\/\/krogragg.com\/?p=25237"},"modified":"2026-02-20T20:02:19","modified_gmt":"2026-02-20T20:02:19","slug":"transoceans-backlog-stands-at-6-1-billion-in-the-wake-of-610m-rig-deals","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=25237","title":{"rendered":"Transocean\u2019s backlog stands at $6.1 billion in the wake of $610M rig deals"},"content":{"rendered":"<p>    Transocean\u2019s backlog stands at $6.1 billion in the wake of $610M rig deals<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Switzerland-based offshore drilling contractor Transocean\u00a0has obtained multimillion-dollar assignments and extensions for seven mobile offshore drilling units (MODUs) from its rig fleet.<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/transoceans-backlog-stands-at-6-1-billion-in-the-wake-of-610m-rig-deals\/\">Transocean\u2019s backlog stands at $6.1 billion in the wake of $610M rig deals<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Melisa Cavcic<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/transoceans-backlog-stands-at-6-1-billion-in-the-wake-of-610m-rig-deals\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Transocean\u2019s backlog stands at $6.1 billion in the wake of $610M rig deals Switzerland-based offshore drilling contractor Transocean\u00a0has obtained multimillion-dollar assignments and extensions for seven mobile offshore drilling units (MODUs) from its rig fleet. The post Transocean\u2019s backlog stands at $6.1 billion in the wake of $610M rig deals appeared first on Offshore Energy. Melisa [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2738,224,537,188,4271,581],"tags":[228],"class_list":["post-25237","post","type-post","status-publish","format-standard","hentry","category-fleet-status-report","category-headline","category-offshore-drilling","category-offshore-energy-biz","category-quarterly-results","category-transocean","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/25237"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=25237"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/25237\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=25237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=25237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=25237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}