{"id":25484,"date":"2026-02-26T04:02:09","date_gmt":"2026-02-26T04:02:09","guid":{"rendered":"https:\/\/krogragg.com\/?p=25484"},"modified":"2026-02-26T04:02:09","modified_gmt":"2026-02-26T04:02:09","slug":"sonamet-secures-25-year-terminal-concession-at-angolas-lobito-port","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=25484","title":{"rendered":"Sonamet secures 25-year terminal concession at Angola&#8217;s Lobito Port"},"content":{"rendered":"\n<div>Sonamet secures 25-year terminal concession at Angola&#8217;s Lobito Port<\/div>\n<p> \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Angolan EPC specialist Sonamet International has secured a 25-year private use concession contract for the management of the oil industry support terminal (OIST) at the Port of Lobito in Angola&#8217;s Benguela province.<\/p>\n<p>The new contract defines the legal and operational bases of the concession, within a framework adopted by the Lobito Port Authority (EPL).<\/p>\n<p>In line with the agreement, EPL will maintain regulation, inspection and coordination functions, while Sonamet will assume responsibility for the industrial and logistical exploration of the space.<\/p>\n<p>With a total area of 762,613 square metres and 323 meters of total berth space, the OIST is consolidated as a facility for operations related to the construction of metal structures and platforms to support oil activity, in accordance with maritime legislation and the general regime of port concessions.<\/p>\n<p>Under the terms agreed, Sonamet must execute an investment plan aimed at the modernisation of terminal infrastructure, strengthening of technical capacity, and continuous improvement of safety, environmental and quality standards.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Jens Karsten<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.bairdmaritime.com\/shipping\/ports\/sonamet-secures-25-year-terminal-concession-at-angolas-lobito-port\">Go to baird maritime<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<div>\n<p>Angolan EPC specialist Sonamet International has secured a 25-year private use concession contract for the management of the oil industry support terminal (OIST) at the Port of Lobito in Angola&#8217;s Benguela province.<\/p>\n<p>The new contract defines the legal and operational bases of the concession, within a framework adopted by the Lobito Port Authority (EPL).<\/p>\n<p>In line with the agreement, EPL will maintain regulation, inspection and coordination functions, while Sonamet will assume responsibility for the industrial and logistical exploration of the space.<\/p>\n<p>With a total area of 762,613 square metres and 323 meters of total berth space, the OIST is consolidated as a facility for operations related to the construction of metal structures and platforms to support oil activity, in accordance with maritime legislation and the general regime of port concessions.<\/p>\n<p>Under the terms agreed, Sonamet must execute an investment plan aimed at the modernisation of terminal infrastructure, strengthening of technical capacity, and continuous improvement of safety, environmental and quality standards.<\/p>\n<\/div>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22,275],"tags":[31],"class_list":["post-25484","post","type-post","status-publish","format-standard","hentry","category-baird-maritime","category-ports-terminals","tag-baird-maritime"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/25484"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=25484"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/25484\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=25484"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=25484"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=25484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}