{"id":3483,"date":"2025-01-17T20:03:57","date_gmt":"2025-01-17T20:03:57","guid":{"rendered":"https:\/\/krogragg.com\/?p=3483"},"modified":"2025-01-17T20:03:57","modified_gmt":"2025-01-17T20:03:57","slug":"norwegian-oil-gas-electrification-story-takes-another-step-forward-with-multimillion-dollar-deal","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=3483","title":{"rendered":"Norwegian oil &amp; gas electrification story takes another step forward with multimillion-dollar deal"},"content":{"rendered":"\n<div>Norwegian oil &#038; gas electrification story takes another step forward with multimillion-dollar deal<\/div>\n<p> \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Equinor has made a move to progress its offshore oil and gas electrification plans on the Norwegian Continental Shelf (NCS) by handing out a contract for early stage engineering services to Multiconsult Norge, in collaboration with subcontractors Aker Solutions and fully owned subsidiary LINK Arkitektur.<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/norwegian-oil-gas-electrification-story-takes-another-step-forward-with-multimillion-dollar-deal\/\">Norwegian oil &amp; gas electrification story takes another step forward with multimillion-dollar deal<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Melisa Cavcic<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/norwegian-oil-gas-electrification-story-takes-another-step-forward-with-multimillion-dollar-deal\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Norwegian oil &#038; gas electrification story takes another step forward with multimillion-dollar deal Equinor has made a move to progress its offshore oil and gas electrification plans on the Norwegian Continental Shelf (NCS) by handing out a contract for early stage engineering services to Multiconsult Norge, in collaboration with subcontractors Aker Solutions and fully owned [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2126,239,240,249,234,224,2127,2128,129,2129,188,811],"tags":[228],"class_list":["post-3483","post","type-post","status-publish","format-standard","hentry","category-aker-solutions","category-decarbonization","category-electrification","category-energy-transition","category-equinor","category-headline","category-link-arkitektur","category-multiconsult","category-norway","category-norwegian-continental-shelf","category-offshore-energy-biz","category-oil-and-gas-electrification","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/3483"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3483"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/3483\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3483"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3483"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}