{"id":721,"date":"2024-11-15T20:03:23","date_gmt":"2024-11-15T20:03:23","guid":{"rendered":"https:\/\/krogragg.com\/?p=721"},"modified":"2024-11-15T20:03:23","modified_gmt":"2024-11-15T20:03:23","slug":"borr-drilling-takes-delivery-of-newbuild-rig-from-seatrium-ahead-of-schedule","status":"publish","type":"post","link":"https:\/\/krogragg.com\/?p=721","title":{"rendered":"Borr Drilling takes delivery of newbuild rig from Seatrium ahead of schedule"},"content":{"rendered":"<p>    Borr Drilling takes delivery of newbuild rig from Seatrium ahead of schedule<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n    <!-- no image --><br \/>\n \t<BR><br \/>\n<BR><\/BR><\/p>\n<div>\n<p>Seatrium has\u00a0delivered another newbuild jack-up rig earlier than expected to Borr Drilling. This handover of the final unit in a multi-rig series is said to have been completed almost a year before it was due.<\/p>\n<p>The post <a href=\"https:\/\/www.offshore-energy.biz\/borr-drilling-takes-delivery-of-newbuild-rig-from-seatrium-ahead-of-schedule\/\">Borr Drilling takes delivery of newbuild rig from Seatrium ahead of schedule<\/a> appeared first on <a href=\"https:\/\/www.offshore-energy.biz\/\">Offshore Energy<\/a>.<\/p>\n<\/div>\n<p> \t<BR><br \/>\n <BR><\/BR><br \/>\n    Melisa \u010cav\u010di\u0107<br \/>\n \t<BR><br \/>\n<BR><\/BR><br \/>\n<a href=\"https:\/\/www.offshore-energy.biz\/borr-drilling-takes-delivery-of-newbuild-rig-from-seatrium-ahead-of-schedule\/\">Go to offshore energy biz<\/a><br \/>\n \t<BR><br \/>\n <BR><\/BR><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Borr Drilling takes delivery of newbuild rig from Seatrium ahead of schedule Seatrium has\u00a0delivered another newbuild jack-up rig earlier than expected to Borr Drilling. This handover of the final unit in a multi-rig series is said to have been completed almost a year before it was due. The post Borr Drilling takes delivery of newbuild [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[536,224,537,188,238,538],"tags":[228],"class_list":["post-721","post","type-post","status-publish","format-standard","hentry","category-borr-drilling","category-headline","category-offshore-drilling","category-offshore-energy-biz","category-seatrium","category-var-jack-up-rig","tag-offshore-energy-biz"],"_links":{"self":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/721"}],"collection":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=721"}],"version-history":[{"count":0,"href":"https:\/\/krogragg.com\/index.php?rest_route=\/wp\/v2\/posts\/721\/revisions"}],"wp:attachment":[{"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/krogragg.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}